Forum Discussion
Power management Agiilex 3/5 - Powerdown then HPS restart ?
- 1 month ago
Hi
Your understanding is correct except for point number 2. The SDM does not get a new power configuration each time.
The SDM will get the power configuration from the bitstream.
The Bitstream will contain the power configuration selected base on the HPS IP settings, user are not able to change the power configuration.
Hi
thanks for the reply.
OK, so as I understand it , in order to change the power configuration :
- HPS will park all the fabric bridges to complete transactions and set signals is a safe state.
- SDM will need to be told what will be the new power configuration (somehow - this information has to survive the reset - I expect that a mailbox command could be sent to the SDM with new power config info, OR the data could be written by the HPS to on chip memory and the SDM could read it)
- SDM gets a command to reset the system
- Fabric is unaffected by the HPS subsystem reset
- SDM initialized power configurations
- SDM needs to configure fabric bridges
- SDM boots HPS.
- HPS communicates on IO to fabric to continue transactions
Does the fabric, in this case, need to treat the bridge and logic to the HPS as a reconfigurable region so that signals are maintained or isolated correctly ?
Is there any documentation you can point me to that specifically examines these questions,
thanks
glen
- tehjingy_Altera1 month ago
Regular Contributor
Hi
Your understanding is correct except for point number 2. The SDM does not get a new power configuration each time.
The SDM will get the power configuration from the bitstream.
The Bitstream will contain the power configuration selected base on the HPS IP settings, user are not able to change the power configuration.