Forum Discussion
Power management Agiilex 3/5 - Powerdown then HPS restart ?
- 1 month ago
Hi
Your understanding is correct except for point number 2. The SDM does not get a new power configuration each time.
The SDM will get the power configuration from the bitstream.
The Bitstream will contain the power configuration selected base on the HPS IP settings, user are not able to change the power configuration.
Hi glenenglish
The FSBL does not control the power settings.
This is done by the SDM. The SDM will gather which core to be powered down from the bitstream and do it before passing control over to the FSBL.
Which core to be remained powered on are selected in the HPS IP parameter.
https://docs.altera.com/r/docs/813752/26.1/hard-processor-system-component-reference-manual-agilextm-5-socs/power-configurations
OK, thanks for the info..
so, back to my core question-
In HPS boot-first mode : When a power CHANGE is required in the HPS domain, can the fabric stay running (assuming that there are no outstanding HPS<> fabric DMA requests or transactions pending across the fabric<>HPS bridge ) ?
- tehjingy_Altera1 month ago
Regular Contributor
Hi
There is no power change ability in the HPS domain. This is done by the SDM connected to the HPS domain and it is only done on boot up.
During run time a power change could not be done.
If you mean a reset happening during run time.
Yes, the fabric is remain running during the HPS reset event.
After reset the HPS will do a reset of the fabric connected to the HPS bridges through the bridge reset signals.