antonkulya
New Contributor
4 years agoArria 10 power management
Is there are possibility to design the PCB with the Arria10 in such way that it is possible to shutdown the FPGA part while keeping the HPS running and being able to communicate with the HPS via Ethernet. The purpose is to avoid overheating of the system while being able to explore and configure the device for further use in optimal thermal conditions.
In https://www.intel.com/content/dam/www/programmable/us/en/pdfs/literature/an/an-a10-soc-device-design-guidelines.pdf, section 4.2.5.4 Managing Power by Shutting Down Supplies it is written that shutting down VCC will affect I/Os. But is there any solutions to my task?
Regards,
Anton