Why is the link-up failure observed for the F-tile Dynamic Reconfiguration Suite IP with Auto-Negotiation and Link Training (AN/LT) enabled designs when trying to skip Link Training (LT)?

Description

Due to a problem in the Quartus® Prime Pro Edition software version 24.3.1, you may see the link-up failure for the F-tile Dynamic Reconfiguration Suite IP with Auto-Negotiation and Link Training (AN/LT) enabled designs when trying to skip Link Training (LT).

Resolution

Currently, there is no workaround for this problem. 
The ideal user flow is as follows: 

AN --> AN done --> perform DR --> DR done --> start LT --> LT done --> data mode+send traffic

This problem is fixed beginning with the Quartus Prime Pro Edition software version 25.1.1.