Forum Discussion
Altera_Forum
Honored Contributor
13 years ago --- Quote Start --- If you have several clocks in your design, each one is analysed by Timequest, and the maximum possible value is given for each one of them. --- Quote End --- So that means there is a critical path for each clock. I just realize that I can check the critical path if it fails to meet time requirements in "Top failing paths" report. But if my design meet time requirement, but I still want to find where the critical path is, what should I do? Thanks very much.