Forum Discussion
Altera_Forum
Honored Contributor
16 years agoThanks,
I suppose the fitter place and route the design and then there is the timing analisys. If I have for example 100 failed paths the one routed is included in these 100 or the one routed is ok and there are other 100 paths failed? I am using the classic analyzer. Best regards. Stefano