Forum Discussion
Altera_Forum
Honored Contributor
21 years agoMultiple-Clock Domain with 2 Nios?
Hello, I tried the new multiple-clock domain feature (Quartus 4.2, Nios1.1) with a Cyclone evaluation board. One Nios should boot from flash and run out of SDRAM, the other Nios should also b...
Altera_Forum
Honored Contributor
21 years agoHi BadOmen,
In the first one, Nios, SDRAM controller, timer, uart, some PIOs, some interface to user logic and access to the tri-state-bridge (for booting). In the second, Nios, uart, tri-state-bridge (with SRAM, Flash), some PIOs and also some interface to user logic. The only common interface is the tri-state-bridge (instruction and data). Why do you ask?