Forum Discussion
Altera_Forum
Honored Contributor
15 years agoIs there out anybody out that tests the nios II at a system (complete device) level with an RTL simulation? (or 'real' SDF timing).
Surely this is part of a 'standard' SOPC design flow. How else would verification with 'real' SDF timing be achievable without having a method of doing this?? It would be impossible any other way in my eyes and surely this is something that needs to be covered for anything that is timing critical. Please enlighten me. Somebody....