Forum Discussion
Hi.
You are not right.
All I/Os pins are tied to an internal weak pull-up during Power Up and Reset. See page 244.
I see that VCCIO is Not Monitored by the POR Circuitry. See page 321. I repeat my question. May I not supply voltage to VCCIO during power up and configuration?
https://www.intel.com/content/dam/www/programmable/us/en/pdfs/literature/hb/cyclone-v/cv_5v2.pdf
Hi,
Yes, All I/Os pins are tied to an internal weak pull-up during Power Up and Reset.
Coming back to the question
- May I not supply voltage to VCCIO during power up and configuration?.Yes, VCCIO is not required for power up and configuration.
2.How long may I not supply voltage to VCCIO?
VCCIO is not monitored by POR so it can be as long as you like.
We can power up VCCIO for IO banks individually after configuration based on our design requirements.
Let me know if you need any further assistance.
Best Regards,
Anand