Forum Discussion
Thanks for reply.
I guess I had hoped for a way to "acknowledge" the power report rather than ignoring it, and have it re-generate based on some constraints, if something in changed.
Most of our designs will live for a long time (typ 10+ years of maintenance). There is no guarantee that the same designers are still here in 10 years, and it is not a given that someone new 10 years from now will understand why, or even notice that there is a critical warning being ignored.
With other critical warnings, e.g. timing - given proper constraints, if someone down the road does something "stupid", the build fails on "critical warning - timing not met", and whoever made the "stupid" change would have to deal with it right away, which is fairly easy since one would only need to analyze changes made during the last 24hr.