Forum Discussion
NazrulNaim_Intel
Regular Contributor
1 year agoHi,
Sorry for the delay. For your information, all power rails in Group 1 must ramp up (in any order) to a minimum of 90% of their respective nominal voltage before the power rails from Group 2 can start ramping up. The power rails within Group 2 can ramp up in any order after the last power rail in Group 1 ramps to the minimum threshold of 90% of its nominal voltage.
For more information regarding the power sequence of Agilex 7, it can be accessed through the link below.
Link : 3.2. Power-Up Sequence Requirements (intel.com)
Hope that helps and do let me know if I can assist you any further.
Best regards,
Nazrul Naim