Forum Discussion
AqidAyman_Altera
Regular Contributor
5 months agoHello,
For the 10M08DAF256I7G (MAX 10 production device), a specific power-up sequence is not required, unlike early engineering sample (ES) devices, all power rails (VCC, VCCINT, VCCA, VCCIO, etc.) can be ramped up in any order or simultaneously, provided that absolute maximum and recommended operating conditions are not violated. The sequencing shown in the attached images applies only to ES devices; for production devices, you may power the rails without a defined sequence. Please ensure that all supplies are stable before configuration begins.
Reference: https://www.intel.com/content/www/us/en/docs/programmable/683400/18-0/hot-socketing.html
Regards,
Aqid