Forum Discussion
Altera_Forum
Honored Contributor
16 years agoRun report_timing with -setup and -hold between the two clocks to see what the setup and hold requirements are with these multicycles. Naturally, this is what the original designer wanted the paths to be analyzed at. The difficult question is if the design actually behaves this way.