Forum Discussion
Cyclone 10 GX EMIF Debug Toolkit, Error on Link Project to Device
- 3 years ago
Hi Jeff,
You do not to worry about Fitter location because the Fitter location is auto generated by Quartus.
The important thing here is the location must be able to pass the Fitter compilation.
After you have filled all location according to schematic, you can recompile the design again.
Regards,
Adzim
Hi Jeff,
Do you have any update in this issue?
Are you able to use Pin Planner tool to place the pins?
Regards,
Adzim
Hi Adzim,
I tried to run "I/O Assignment Analysis" on the pin planner. The warning message is attached.
However, I still don't know how to solve the problem with the pin planner.
Best Regards,
Jeff
Info (20273): Intermediate fitter snapshots will not be committed because ENABLE_INTERMEDIATE_SNAPSHOTS QSF assignment is disabled during compilation.
Info (20274): Successfully committed planned database.
Info (12517): Periphery placement operations ending: elapsed time is 00:00:40
Warning (171167): Found invalid Fitter assignments. See the Ignored Assignments panel in the Fitter Compilation Report for more information.
Info: Quartus Prime Fitter was successful. 0 errors, 5 warnings
Info: Peak virtual memory: 8233 megabytes
Info: Processing ended: Wed May 3 17:38:08 2023
Info: Elapsed time: 00:00:46