Regarding agilex7 FPGA, the document "ug-ag-pwr-683373-666351.pdf" states that the power sequence should be in the order of group 1 to group 3.
For example, what kind of problems would occur if groups 1 to 3 were accidentally powered on at the same time?
Damage to the agilex7 device, increased current consumption, etc.
Due to the board design, groups 1 to 3 will be installed at the same time, but I am considering powering them on in the following order. Will this be a problem?
1. Power on groups 1 to 3 at the same time.
2. After about 500 ms, power off groups 1 to 3.
3. After 1 second, power on groups 1, 2, and 3 in the order of the power sequence.