Forum Discussion
Altera_Forum
Honored Contributor
16 years agothese signals are quite critical. I assign a MAX_DELAY constaints of 1ns. The router can't achieve it.
i'm quite sure that it can achieve it, because it achieve constraints in a previous routing (design was closed). that's why I want to force the routing of these signals first. I create the .rcf file. I found signals, I remove others. And do I just to run a compilation? And tools keeps the selected signals? So I have to take the rcf from a design which was correctly routed?