Forum Discussion

Altera_Forum's avatar
Altera_Forum
Icon for Honored Contributor rankHonored Contributor
13 years ago

Replacing EPF6016QC208-2

Dear All,

I work in maintenance dept, I Would like to know if epf6016qc208-2 can be replaced by epf6016qc208-4. I am wondering the only diference betweent this two components is speed ( Original one: 2 and replacement part: 4).

Could any body answer me if I can directly replace the final -2 by final -4?

Thanks a Lot.

Everton Sales - Brazil

1 Reply

  • Altera_Forum's avatar
    Altera_Forum
    Icon for Honored Contributor rankHonored Contributor

    hi!!! First you have to know that the FLEX -4 is slower than -2! That means, you have to synthesis and place your project and look if you got timing violations in your design (use the Timing Analyzer)!! If you get timing violations and you can't correct them, you can't just relaced it! But if you dont have timming violations... you can!

    Are you sure there is a flex with speed grade 4?? I think they just have in stock 2 and 3!!

    m

    here from flex docu:

    Timing simulation and delay prediction are available with the Simulator

    and Timing Analyzer, or with industry-standard EDA tools. The

    Simulator offers both pre-synthesis functional simulation to evaluate logic

    design accuracy and post-synthesis timing simulation with 0.1-ns

    resolution. The Timing Analyzer provides point-to-point timing delay

    information, setup and hold time analysis, and device-wide performance

    analysis.