Forum Discussion

Altera_Forum's avatar
Altera_Forum
Icon for Honored Contributor rankHonored Contributor
13 years ago

PLL: Clock switchover (Cyclone III)

I have a doubt with the automatic clock switchover. I'm trying to connect two clocks of 168 Mhz as inputs of a pll, when one of this is available, the other is not and vice versa. Does anyone know if it is necessary that the second is running before the current reference clock is not present?

Thanks in advance.

Cris
No RepliesBe the first to reply