Forum Discussion
Altera_Forum
Honored Contributor
18 years agoFFT timing?
Hi I need to perform a 256 point FFT operation. I use the SOP and EOP signals to indicate the start and end of operation with sink_ready always high. My simulation suggests that the input data is per...
Altera_Forum
Honored Contributor
18 years agoIn reference to your second comment. If you are crossing clock domains from source->sink you are going to need a dcfifo or something like that (your own synchronization scheme) in order to synch up the two different clocks and I/O signals.