Forum Discussion
Mingyuexin
Occasional Contributor
7 years agoTiming violation when route emac from HPS to FPGA in quartus prime standard 18.1
Hi, I need to use route EMAC from HPS to FPGA because our system need 4 channels of ethernets, and one USB interface also. I refer to the examples from here https://rocketboards.org/foswiki/Projec...
KennyT_altera
Super Contributor
7 years agoThen you just overconstrain that path specifically.
- Mingyuexin7 years ago
Occasional Contributor
As I said, this path has both setup violation and hold violation. Please advice me how to over constrain this path. I attached the detail of this path. I referred to http://www.rkra.de/quartus/Timequest/Timing%20Constraints%20-%20Altera%20Wiki.html for over constrain advice, as I know, over constrain works for small setup violation, and there is long distance between two registers. But in my case, I do not see two registers.
With best wishes
Jasmine